[1]
Kurniawan, M.I., Wulandari, D.A.R., Wulandari, D.A.R., Tistogondo, J. and Tistogondo, J. 2021. Evaluation Of Construction Project Time And Cost Control Based On Earned Value And Crash Project Method . Neutron. 21, 1 (Jul. 2021), 20-26.