[1]
Syamsudin, A.S., Tistogondo , J. and Restuti Wulandari , D.A. 2023. COST AND TIME PERFORMANCE ANALYSIS ON CONTROLLING CONTRUCTION PROJECTS WITH “PERT” METHOD. Neutron. 22, 2 (Feb. 2023), 99-103. DOI:https://doi.org/10.29138/neutron.v22i2.184.