(1)
Kurniawan, M. I.; Wulandari, D. A. R.; Wulandari, D. A. R.; Tistogondo, J.; Tistogondo, J. Evaluation Of Construction Project Time And Cost Control Based On Earned Value And Crash Project Method . neutron 2021, 21, 20-26.