(1)
Syamsudin, A. S.; Tistogondo , J.; Restuti Wulandari , D. A. COST AND TIME PERFORMANCE ANALYSIS ON CONTROLLING CONTRUCTION PROJECTS WITH “PERT” METHOD. neutron 2023, 22, 99-103.