KURNIAWAN, M. I.; WULANDARI, D. A. R.; WULANDARI, D. A. R.; TISTOGONDO, J.; TISTOGONDO, J. Evaluation Of Construction Project Time And Cost Control Based On Earned Value And Crash Project Method . Neutron, v. 21, n. 1, p. 20-26, 31 Jul. 2021.