SYAMSUDIN, A. S.; TISTOGONDO , J.; RESTUTI WULANDARI , D. A. COST AND TIME PERFORMANCE ANALYSIS ON CONTROLLING CONTRUCTION PROJECTS WITH “PERT” METHOD. Neutron, v. 22, n. 2, p. 99-103, 23 Feb. 2023.