Kurniawan, M. I., Wulandari, D. A. R., Wulandari, D. A. R., Tistogondo, J. and Tistogondo, J. (2021) “Evaluation Of Construction Project Time And Cost Control Based On Earned Value And Crash Project Method ”, Neutron, 21(1), pp. 20-26. Available at: http://ejournal.worldconference.id/index.php/neutron/article/view/121 (Accessed: 8August2026).