[1]
M. I. Kurniawan, D. A. R. Wulandari, D. A. R. Wulandari, J. Tistogondo, and J. Tistogondo, “Evaluation Of Construction Project Time And Cost Control Based On Earned Value And Crash Project Method ”, neutron, vol. 21, no. 1, pp. 20-26, Jul. 2021.