[1]
A. S. Syamsudin, J. Tistogondo, and D. A. Restuti Wulandari, “COST AND TIME PERFORMANCE ANALYSIS ON CONTROLLING CONTRUCTION PROJECTS WITH ‘PERT’ METHOD”, neutron, vol. 22, no. 2, pp. 99-103, Feb. 2023.