1.
Kurniawan MI, Wulandari DAR, Wulandari DAR, Tistogondo J, Tistogondo J. Evaluation Of Construction Project Time And Cost Control Based On Earned Value And Crash Project Method . neutron [Internet]. 2021Jul.31 [cited 2022Dec.7];21(1):20-6. Available from: http://ejournal.worldconference.id/index.php/neutron/article/view/121