Workload Analysis and Workforce Requirement Planning in Operational Division of PT Solusi Marine Indonesia Using the Full-Time Equivalent Method
Abstract
This study aims to analyze the workload and determine the workforce requirements in operational division of PT. Solusi Marine Indonesia using the Full-Time Equivalent (FTE) method. This research was motivated by the imbalance in workload, fluctuating working hours, and the high frequency of overtime, which may lead to work fatigue and employee burnout. The study employed a descriptive quantitative approach with data collection techniques including observation, interviews, and documentation. The results indicate that the FTE value in the operational division ranges from 1.45 to 1.49, which reflects an overload condition. Based on the calculation results, the ideal number of employees required is 10, while the actual number of employees is only 8. Therefore, the company lacks 2 employees. The findings are expected to serve as a reference for management in making decisions regarding workforce addition or task redistribution in order to improve effectiveness and efficiency in the operational division.
References
Ambikka, A., & Nadlifatin, R. (2024). Workload Analysis of The Merchant Ship Division Using The Full Time Equivalent Method. Eduvest - Journal of Universal Studies, 4(7), 5849–5855. https://doi.org/10.59188/eduvest.v4i7.1349
Apriadi, D. (2022). WORKLOAD ANALYSIS USING THE FULL TIME EQUIVALENT (FTE) METHOD TO OPTIMIZE THE WORKFORCE OF THE LEGAL SETTLEMENT UNIT AND ITS SUPPORTING UNIT PT TELKOM INDONESIA (PERSERO) TBK. Jurnal Ekonomi, 11(1), 140–149.
Aryasa, I. G. I., Juliana, M., & Sitanggang, B. E. I. (2025). Perencanaan Tenaga Kerja Unit Operasi & Pemeliharaan Bagian Keselamatan & Keamanan IT (Studi Kasus Terminal 3 Bandara Soekarno Hatta). JURNAL RISET DAN APLIKASI TEKNIK INDUSTRI, 3(01), 22–29. https://doi.org/10.24843/JRATI.2025.v03.i01.p04
Cahyani, R. R. (2024). Studi literatur: Analisis beban kerja dengan metode Full Time Equivalent (FTE). Jurnal Ekonomi Bisnis Dan Kewirausahaan, 13(1), 51–56. https://doi.org/https://doi.org/10.47942/jebiskwu.v13i1.1749
Damayanti, M. K. (2023). PERENCANAAN KEBUTUHAN PEGAWAI BERDASARKAN ANALISIS BEBAN KERJA MELALUI METODE FTE (FULL TIME EQUIVALENT) PADA PT. X. Civil Service Journal, 17(1), 1–14. https://doi.org/10.61133/pns.v17i1.388
Fatmawaty, F., Tukan, M., & Kakerissa, A. L. (2026). Full Time Equivalent - Based Workforce Analysis of Head Truck Operators at Ambon Container Terminal. ARIKA, 20(1), 76–88. https://doi.org/10.30598/arika.2026.20.1.76
Kabul, E. R., & Febrianto, M. N. (2021). Implementasi metode Full Time Equivalent (FTE) dalam analisis kebutuhan tenaga kerja. IKRAITH-EKONOMIKA, 5(1), 162–168.
Kartini, Y., & Hasibuan, S. (2024). Analisis beban kerja menggunakan metode Full Time Equivalent (FTE) untuk mengoptimalkan kinerja. Proceeding Mercu Buana Conference on Industrial Engineering. Proceeding Mercu Buana Conference on Industrial Engineering, 6, 102–116. https://doi.org/https://doi.org/10.22441/MBCIE.2024.011
Mazitah, N., Dahlan, M., & Ahmad, A. (2023). Employee Workload Analysis Using the Full Time Equivalent Method in the Production Division at PT. Indonesian Ship Industry (Persero) Makassar. Journal of Industrial System Engineering and Management, 2(1), 13–22. https://doi.org/10.56882/jisem.v2i1.16
Muchlisin, M. N. (2021). Work Load Analysis dengan Full Time Equivalent Sebagai Pertimbangan Pembagian Beban Kerja Karyawan. Psyche 165 Journal, 14(2), 233–238. https://doi.org/https://doi.org/10.35134/jpsy165.v14i2.105
Prasetyo, G. B., Sukamdani, N. B., & Sukwika, T. (2023). Employee Workload Analysis at The Financial Services Authority Human Resources Management Directorate with Full Time Equivalent (FTE). JENIUS (Jurnal Ilmiah Manajemen Sumber Daya Manusia), 6(3), 649. https://doi.org/10.32493/JJSDM.v6i3.29912
Rahmi, F., & Suhada, R. T. (2024). Analisis beban kerja dalam menentukan jumlah tenaga kerja optimal di Departemen Quality Control PT NPI dengan metode Full Time Equivalent. Proceeding Mercu Buana Conference on Industrial Engineering, 6. https://doi.org/https://doi.org/10.22441/MBCIE.2024.034
Sari, S., Imron, F. F., Nurfajriah, N., & Rahayu I.M, F. (2022). Workload Analysis with Full Time Equivalent Method to Optimize Production Unit Performance at PT X. Journal of Integrated System, 5(2), 173–183. https://doi.org/10.28932/jis.v5i2.5404
Sumarniati, N. K., Lasalewo, T., & Wunarlan, I. (2023). PENGUKURAN BEBAN KERJA PADA WAKTU NORMAL DI DIVISI OPERASIONAL PT. PELINDO REGION IV GORONTALO DENGAN METODE FULL TIME EQUIVALENT (FTE). Jurnal Vokasi Sains Dan Teknologi, 2(2), 45–55. https://doi.org/10.56190/jvst.v2i2.33
Taufan, S., Rahmawati, R., Mujiyono, M., & Iskandar, D. A. (2023). Workload analysis with the full time equivalent method approach to determine workforce required. Jurnal STEI Ekonomi, 32(2), 211–222. https://doi.org/10.36406/jemi.v32i02.1371