Return to Article Details Evaluation and Optimization of Time Management for the Construction Project of Kedang Ipil Water Supply System (SPAM) with a Capacity of 30 Liters per Second in Kota Bangun Darat District Using the Critical Path Method (CPM) Download Download PDF